Required Before Works

Pre-Demolition Asbestos Survey — Adelaide

Required before demolition, refurbishment, or strip-out of any pre-2004 building. Fast turnaround. Defensible reporting. Avoid stop-works and liability.

Required before worksFast turnaroundAdelaide-wide

Demolition planned? A survey is required before works begin — book now to avoid stop-works.

Required by law

Pre-2004 buildings need a survey before any disturbance, demolition, or strip-out.

Stop-works risk

SafeWork SA can shut your site down on inspection — exposing owners and PCBUs to liability.

Fast turnaround

Adelaide-wide response. Tell us your demo date and we'll work back from there.

7 min read Last updated May 2026

Get clarity before you start.

Book a pre-demolition asbestos survey — Adelaide-wide.

What is a pre-demolition asbestos survey?

A pre-demolition (or pre-refurbishment) survey is a targeted, often intrusive inspection designed to:

  • Identify all asbestos in the work area
  • Allow safe removal before works begin
  • Prevent exposure during demolition or strip-out

When is it required?

You must carry out a survey before:

  • Demolition
  • Refurbishment and strip-out
  • Major maintenance works that disturb structure or linings
Key takeaway
If the building was constructed before 2004 and you are about to break, cut, or remove material — you need a pre-demolition or pre-refurbishment survey first.

Why a standard register is NOT enough

Asbestos register

Non-destructive · visible only

A register identifies known and suspected ACMs in accessible areas. It manages day-to-day risk — but does not look behind walls, under floors, or inside ceiling voids.

Pre-demolition survey

Goes further · accesses concealed spaces

Targeted intrusive inspection of wall cavities, floor build-ups, and ceiling voids — the areas demolition will actually disturb.

Learn more about asbestos registers

What AX4 does

  • Review your existing asbestos register
  • Conduct a targeted intrusive inspection of the work zone
  • Identify concealed asbestos risks before they're disturbed
  • Arrange NATA-accredited laboratory sampling
  • Provide clear, defensible recommendations and scope of removal

How an AMP triggers further assessment

What happens if you skip this step

Risk

Work stoppages

SafeWork SA can shut the site down on inspection.

Risk

Exposure risk

Workers and the public exposed to airborne fibres.

Risk

Legal liability

Owners, PCBUs, and officers carry personal duties.

Risk

Cost blowouts

Emergency removal and rework cost multiples of a planned survey.

Typical workflow

  1. 1Project planned
  2. 2Survey conducted
  3. 3ACM identified
  4. 4Removal arranged with licensed removalist
  5. 5Clearance issued
  6. 6Works proceed safely
Tight deadline? We'll work back from your demolition date.Book now

Fast turnaround for projects

We support builders, project managers, developers, and property owners.

Key takeaway
Time-critical project? Tell us the date demolition starts and we'll work back from there.
Get clarity before you start

Planning works? Don't start without a survey.

One pre-demolition survey now is cheaper, faster, and safer than a stop-work later.

  • Avoid delays, risk, and rework
  • Adelaide-wide response
  • Defensible reporting your removalist and SafeWork SA can rely on
Frequently Asked

Pre-demolition survey FAQs

Share

Disclaimer: this is a plain-English overview of pre-demolition asbestos survey requirements in South Australia, not legal advice. Survey scope is confirmed in writing before works commence.

Take action now

Reading is good. Acting is better. Book your inspection.

Don't leave it on the page

Pick the line that matches you — and act today.

Each line is one click. We'll take it from there.